Incomplete packs create silent assumptions. Brand and PD teams should lock the sections factories actually open before the first sample round.
Sections that commonly slip
- POM timing (before wash / after wash / both)
- Construction callouts for knit vs woven
- BOM notes that match the wash story
- Wash acceptance and sealed reference pointers
- Must-match vs flexible attributes

MOQ, sample fees, and calendars are confirmed in quotation—not published as fixed site terms.
Measurement specs before and after wash · Request a Quote
When this applies
- First sampling without a complete pack
- Chat decisions never landed on the pack
