Incomplete packs create silent assumptions. Brand and PD teams should lock the sections factories actually open before the first sample round.

Sections that commonly slip

  • POM timing (before wash / after wash / both)
  • Construction callouts for knit vs woven
  • BOM notes that match the wash story
  • Wash acceptance and sealed reference pointers
  • Must-match vs flexible attributes
Illustrative points-of-measure sketch on a tech pack style sheet
Illustrative POM sketch—adapt fields; do not treat graphic numbers as live specs.
MOQ, sample fees, and calendars are confirmed in quotation—not published as fixed site terms.

Measurement specs before and after wash · Request a Quote

When this applies

  • First sampling without a complete pack
  • Chat decisions never landed on the pack